EPCPROMAN News
Project

EPCPROMAN Enterprise Implementation for Wood – Habshan Gas Processing Facilities, UAE

EPCPROMAN is implementing EPCPROMAN Enterprise for Wood's Habshan Gas Processing Facilities – Debottlenecking / P5 Project (ADNOC Gas, Abu Dhabi, UAE), covering 26,000 piping isometrics, 70,000 pipe spools, and 1,400,000 Inch Dia of fabrication & erection scope — with AUTOSPOOL, WHAM, MATCONTRK, SPOOLMAN, ERMAN, TPM, PRODOCS, Barcode/RFID tracking, and 3D progress monitoring.

Project

06 Nov 2026

EPCPROMAN is proud to play an active role in the construction of the long-term gas processing facilities at the UAE's Habshan facility by providing EPCPROMAN Enterprise Software Solutions and Technical Operating Manpower for Material and Construction Management. The implementation covers Piping and Structural construction activities, supported by Barcode/RFID-based automation for Piping Spool and Structural Assembly Tracking, with construction progress representation on 3D models using colour-coded status indicators. The project implementation also includes PRODOCS (Electronic Document Management System) for project documentation management.

EPCPROMAN Enterprise Implementation for Wood – Habshan Gas Processing Facilities, UAE

EPCPROMAN Enterprise – Software Modules

  • EGOLD — Office Suite Management

  • AUTOSPOOL — Piping Spooling Management

  • WHAM — Warehouse Management

  • MATCONTRK — Material Control & Tracking

  • SPOOLMAN — Spool Fabrication & Installation Management

  • ERMAN — Erection Management

  • TPM — Test Package Management

  • CIVIL & STRUCTURAL — Civil & Structural Construction Management

  • E&I — Electrical & Instrumentation Construction Management

  • TNT — Barcode-Based Spool Progress Monitoring

  • PRODOCS — Electronic Document Management

Milestone Achieved

EPCPROMAN is proud to announce its ongoing implementation of EPCPROMAN Enterprise Software Solutions for Wood's long-term gas processing facilities and debottlenecking scope at the Habshan facility in Abu Dhabi, UAE, under the ADNOC Gas P5 Project. The implementation includes dedicated Technical Operating Manpower and integrated solutions for Engineering, Material Management, and Construction Management, covering 26,000 Piping Isometrics, 70,000 Pipe Spools, and 1,400,000 Inch Dia of Fabrication and Erection scope.